Indoor Pool Cullera

/
/
/
Indoor Pool Cullera

Project:

Development:

From a project that the developer estimated an excessive cost, we proposed an alternative reduction of 900 m2 of surface circulation while maintaining the same program. There is a new organization of the program increasing the efficiency in the management. We produced changes such as halving the size of the pool to increase the energy efficiency. The project is in collaboration with Pallejà-León Architects.

 

Gallery

Skip to content